Latest Case Study:

The Edge Line

The Challenge:

To develop improved machinery for bagging processes, by developing a discharge bagging system capable of handling initial loads of up to 800kg, and bagging this in 2.5kg bags.

The Arlo Solution:

We successfully developed The Edge Line, which increased capacity and sped up the bagging process by reducing downtimes caused by frequent bag replacement. The project also addressed the limitation in existing technology, such as hindered processes due to weight limitations and the need for a platform for safe access and cleaning.

Before:

After:

Interested to find out more about how we could bring your project to life?